Pool Renovation · Hollywood, FL · Broward County

Pool Renovation in Hollywood, FL — Free Estimates, Permits Handled

Serving Hollywood and all of Broward County. Call for a free written estimate — Mon–Sat 8am–7pm.

Mon–Sat 8am–7pm·Broward County·Free Written Estimates

Hollywood · Broward County

What Hollywood Homeowners Should Know About Pool Renovation

Pool renovation in Hollywood most commonly starts with resurfacing — South Florida pools are used year-round, and standard plaster finishes typically last 7–12 years before chalking, staining, or cracking. We also handle coping, tile, deck work, and equipment upgrades. Every Broward County pool renovation that involves structural or electrical changes is permitted and inspected.

Hollywood Building Department covers a coastal city with significant residential variety — Art Deco beach buildings, 1950s–1970s CBS neighborhoods inland, and newer master-planned communities further west. Properties in the Coastal High Hazard Area (CHHA) require wind mitigation compliance for all permitted work.

What We Do

Pool Renovation Services in Hollywood

  • Pool resurfacing (plaster, quartz aggregate, pebble)
  • Pool coping and tile replacement
  • Pool deck renovation
  • Equipment upgrades (pumps, filters, heaters)
  • Screen enclosure additions
  • Pool light and electrical upgrades

Service Area

Serving Hollywood and Nearby Areas

We serve Hollywood and the surrounding Broward County communities. Not sure if we cover your area? Call — we serve all of Broward County.

HollywoodPembroke PinesMiramarHallandale BeachDania BeachWest Park

Ready for a free pool renovation estimate in Hollywood?

We assess your project and give you a written estimate — no commitment required. Mon–Sat 8am–7pm.

(786) 983-7928

Common Questions

Pool Renovation in Hollywood — FAQ

How often do pools need resurfacing in Hollywood?

Standard plaster: 7–12 years. Quartz aggregate (Diamond Brite, Hydrazzo): 12–18 years. Pebble finishes (PebbleTec, PebbleSheen): 15–25 years. South Florida pools are used year-round, meaning more chemical exposure and faster surface wear than seasonal-use pools in other climates.

Do pool renovations require a permit in Hollywood?

Structural changes and equipment installations require permits in Broward County. Resurfacing alone typically does not. We advise on permit requirements for your specific scope before any work begins.

How long does pool resurfacing take in Hollywood?

The resurfacing application takes 3–5 days. After application, the pool needs to fill and follow a specific startup process — brushing and chemical adjustment — for 28 days. Most homeowners can swim within 1–2 weeks of completion.

What pool surface lasts longest in South Florida?

Pebble finishes (PebbleTec, PebbleSheen) last 15–25 years and handle South Florida's chemical exposure and UV best. Quartz aggregate is the best middle-ground: 12–18 year life at a moderate cost. Standard plaster is the most affordable but shortest-lived option.

Free Pool Renovation Estimate in Hollywood, FL

We serve Hollywood and all of Broward County. Free written estimates, permits handled, no-pressure assessments.

Call (786) 983-7928
Mon–Sat, 8am–7pm·Hollywood · Broward County·Free Written Estimates
Call NowFree Estimate