Home Additions · Miami Beach, FL · Miami-Dade County

Home Additions in Miami Beach, FL — Free Estimates, Permits Handled

Serving Miami Beach and all of Miami-Dade County. Call for a free written estimate — Mon–Sat 8am–7pm.

Mon–Sat 8am–7pm·Miami-Dade County·Free Written Estimates

Miami Beach · Miami-Dade County

What Miami Beach Homeowners Should Know About Home Additions

Home additions in Miami Beach expand your living space and require full building permits, structural assessment, and in some cases engineering review. Permit processing in Miami-Dade County typically runs 3–6 weeks for additions. We build that timeline into every project schedule from day one — no surprises after you've committed. Every addition is inspected and closed out with a final permit for a complete record.

Miami Beach sits on a barrier island with strict coastal construction requirements. Properties within the historic Art Deco and Mediterranean Revival districts require Historic Preservation Board review before exterior changes — adding time to the permit process. The Miami Beach Building Department handles permits, and CCCL requirements apply to coastal-zone properties.

What We Do

Home Additions Services in Miami Beach

  • Bedroom and master suite additions
  • Garage conversion to living space
  • Sunroom and Florida room additions
  • In-law suite and ADU construction
  • Second-story additions
  • Structural engineering and full permitting

Service Area

Serving Miami Beach and Nearby Areas

We serve Miami Beach and the surrounding Miami-Dade County communities. Not sure if we cover your area? Call — we serve all of Miami-Dade County.

Miami BeachSurfsideBal HarbourNorth Miami BeachAventuraBay Harbor Islands

Ready for a free home additions estimate in Miami Beach?

We assess your project and give you a written estimate — no commitment required. Mon–Sat 8am–7pm.

(786) 983-7928

Common Questions

Home Additions in Miami Beach — FAQ

Do home additions need a permit in Miami Beach?

Yes — any addition that adds new living space requires a full building permit in Miami-Dade County. This includes structural, electrical, plumbing, and HVAC permits as applicable. An unpermitted addition is a code violation that surfaces at resale and can affect mortgage approval.

How long does a home addition take in Miami Beach?

A bedroom addition: 3–5 months from signed contract to final inspection. A master suite: 4–6 months. Permit processing accounts for 3–6 weeks of that in Miami-Dade County. We build this into the schedule from day one — no surprises.

Can I add a second story to my house in Miami Beach?

Possibly — it depends on your existing foundation and framing. Concrete block construction common in South Florida can often support an addition if the foundation is in good condition. We require structural engineering review before committing to any second-story project.

What's the difference between a home addition and an ADU in Miami Beach?

A home addition expands the main dwelling. An ADU (Accessory Dwelling Unit) is a separate self-contained unit on the same property with its own entrance, kitchen, and bath. Florida municipalities vary on ADU rules — some permit them freely, others restrict them. We check zoning before proposing any ADU scope.

Free Home Additions Estimate in Miami Beach, FL

We serve Miami Beach and all of Miami-Dade County. Free written estimates, permits handled, no-pressure assessments.

Call (786) 983-7928
Mon–Sat, 8am–7pm·Miami Beach · Miami-Dade County·Free Written Estimates
Call NowFree Estimate